澳門建築置業商會 - 首頁

首頁 > 最新活動


 
 
 
2019.06.12 CPD 港珠澳大橋(香港段)的建造過程介紹
 
2019-05-20
 

主辦單位
(Organizer): 澳門建築罝業商會、英國特許土木工程測量師學會及香港測量師學會 
MABCD, ICES(Macau), HKIS (QSD),

題目
(Event Name ): 港珠澳大橋(香港段)的建造過程介紹
Construction Highlights of the HK-Zhuhai-Macau Bridge  (HK Section) Project

講者 (Speakers):
 Ir Raymond Wong Wai-man   王煒文 工程師
日期  (Date):
 2019年6月12日

時間  (time):
 晚上7:00至晚上 8:30    19:00 ~ 20:30 
地點 (Venue):
 澳門建築置業商會 (澳門水坑尾街103號建築置業商會大廈五樓)
Macau Association of Building Contractors and Developers (MABCD) (Rua Do Campo No. 103 5Andar, Macau)

語言 (Language):
 廣東話 (英語輔助)   Cantonese (Supplemented with English)  
報名期限 
(Closing Date): 
 由現在起至2019年6日月1日 Now to 01 Jun 2019
收費  (Fee): 會員MOP$80 ; 非會員MOP$150 


內容大綱(Details):

講者將會對下列各項事宜作出講解及討論
The Speaker will discuss the following in his talk:

這次講座將展示及討論港珠澳大橋工程的設計原理及技術特色。這次講座將按以下幾個範疇進行討論  The talk will demonstrate and discuss the design principles and technical features for the construction of the HK-Zhuhai-Macao Bridge project. The talk will further divide into the following sub-categories for discussion:

1. 大嶼山西南沿岸的香港接駁路段的建造工程
Construction of the Hong Kong Link Road along the South-Western coast of Lantau Island.
2. 赤鱲角南環路的香港接駁路段的建造工程
Construction of the Hong Kong Link Road landed onto the South Perimeter Road of CLK
3. 景觀山隧道的接駁橋工程
Link Bridge getting into the tunnel at Scenic Hill
4. 景觀山隧道和人工島之間的接駁路段的建造工程
Link road between the tunnel at Scenic Hill and the Man-made Island
5. 人工島建造工程
Forming of the Man-made Island
6. 邊界過境設施的建造工程
Construction of the Boundary Crossing Facilities
7. 太和站接駁路段的建造工程
Construction of the Link Road (Tai Ho Junction)
8. 人工島站接駁路段的建造工程
Construction of the Link Road (Junction at Man-made Island)
9. 屯門-赤鱲角接駁路段(屯門站)的建造工程
Construction of the Tuen Mun-Chak Lap Kok Link Road (Junction at Tuen Mun)
10. 珠海和澳門設施的簡要說明
Brief illustration of the Zhuhai and Macao facilities

講 師 : 王煒文 工程師
Mr Raymond Wong is an independent researcher and a lecturer in the Division of Building Science and Technology at City University of Hong Kong.  He joined the construction profession in 1977 and obtained his first professional qualification as a Chartered Builder in 1982. Mr Wong is currently a member of the Hong Kong Institution of Engineers and a retired member of the Chartered Institute of Building.  
Mr Wong has conducted a series of studies in tall building construction, industrialized construction systems, urban studies, infrastructure projects and other related studies since 1995. He has published more than 150 papers/articles of various nature and topics based on his studies in such areas.
課程將會申請1.5小時持續專業發展認可活動

 

報名期限: 由2019年5月20日起至2019年6月1日


 座位上限為80人,先到先得。澳門建築置業商會會員優先接受報名。
 
報名表格

本人希望報名  2019年6月12日  港珠澳大橋的建造過程介紹



姓氏:

______________________________________ 聯絡電話:

____________________________________
公司: 

                                     職位: 
                                  

會藉 :  澳門建築置業商會         
 

報名費 _________________________


 

 

 

 

聯絡我們

 

 
電話
傳真
電郵
853 2857 3226    853 2834 5710    mabcd@macau.ctm.net
         
地址
       
澳門水坑尾街 一百零三號五樓

 

 

澳門建築置業商會 版權所有 © 2020

聯絡我們

 

 

電話
  傳真
 
853 2857 3226    853 2834 5710   
電郵
     
mabcd@macau.ctm.net
       
地址
     
澳門水坑尾街 一百零三號五樓

 

 

澳門建築置業商會 版權所有 © 2020